Time Management

Edit Work Group - Multi-Step Form

Complete guide to editing an existing work group in Moyee through a 3-step process - changing work group details, adding/removing employees, and reconfiguring attendance settings.

Overview

The Edit Work Group menu is a multi-step process for changing data in an existing work group in Moyee. This feature allows you to update work group information through the same 3 main steps as when creating it: changing details, managing employee membership, and reconfiguring attendance settings.

The Edit Work Group page can be accessed from the Dashboard » Time Management » Work Groups menu by clicking the Edit icon on the work group you want to change.

Step Navigation

The work group edit process consists of the same 3 steps as the creation process.

Step Indicators:

  1. Work Group Details
  2. Add Employees
  3. Attendance Settings

Step 1: Work Group Details (Edit)

First step to change basic work group information.

Form Components (Auto-filled with Existing Data):

ComponentExisting ValueDescription
Work Group Name5/2Can be changed
Project Code6900B181220100Can be changed
**Work Schedule/Shift ***5/2Can be changed
**Calendar ***USE MASTER CALENDARCan be changed

How to Edit Step 1:

  1. Work Group Name
    • Change the work group name if necessary
    • Example: from 5/2 to 5/2 Work Group - Project A
  2. Project Code
    • Change the project code if the work group moves to another project
    • Select from the available dropdown
  3. Work Schedule/Shift
    • Change the work schedule if necessary
    • Example: from 5/2 to 6/1
  4. Calendar
    • Change the calendar used
    • Example: keep using USE MASTER CALENDAR or select another calendar
  5. Click Next to proceed to the next step
  6. Click Back to return to the previous page

Step 2: Add Employees (Edit)

Second step to manage employee membership in the work group.

Two-Panel Display:

Left Panel: Employee List (Available)

This panel displays a list of available employees who are not yet in this work group.

Information:

  • Employees who have not entered any work group (3 available)

Available Employees Table:

IDNamePosition
MUBI.0021Coba 2Project Manager
MUBI.0023Coba 4Environmental Coordinator
MUBI.0026Coba 6project manager

Right Panel: Employee Assigned

This panel displays a list of employees who are already in this work group.

Assigned Employees Table:

IDNamePosition
MUBI.0018YudaProject Manager
MUBI.0013AisyahWorkshop Technician
MUBI.0009AlysaWorkshop Technician
MUBI.0007Tasya DikaDocument Engineer
MUBI.0005Raden GanangWorkshop Technician
MUBI.0010Dimas PrabowoWorkshop Technician
MUBI.0003Sigit PramonoWorkshop Technician

Search Feature

Search columns are available in both panels:

How to Manage Membership:

Adding New Employees:

  1. Find employees in the left panel using the search column
  2. Click the + or Add button on the employee you want to add
  3. The employee will move from the left panel to the right panel

Removing Employees:

  1. Find employees in the right panel using the search column
  2. Click the - or Remove button on the employee you want to remove
  3. The employee will move from the right panel to the left panel
  • Back - Return to Step 1
  • Next - Proceed to Step 3

Step 3: Attendance Settings (Edit)

Third step to change the attendance location settings for the work group.

Select Attendance Location

Components:

  • Select Location (can be multiple)
  • Previously selected locations will be checked

Currently Selected Locations:

  • Radiant Utama Interinsco

List of Available Locations

Here is a list of locations that can be selected/changed for attendance:

NoLocation
1Radiant Utama Interinsco
2Univesitas MH Thamrin Kampus AKA

Location Search Feature

Additional Information

  • Radius: 100 m (maximum distance for attendance validation)
  • Map Data: ©2026 Google
  • Links: Terms, Report a map error

How to Edit Attendance Settings:

  1. Search for locations using the search column (optional)
  2. Check or uncheck the locations you want to change:
    • Add a new location by checking the checkbox
    • Remove a location by unchecking it
  3. You can select more than one location
  4. Click Next to continue, or Back to return to Step 2

Complete Edit

After completing Step 3, click the Save or Update button to save all changes.

Summary of changes to be saved:

  • Work group detail changes (name, project, shift, calendar)
  • Employee membership changes (add/remove)
  • Attendance location changes

Usage Tips

  1. Double-check changes - Before saving, ensure all changes are correct.
  2. Communicate with the team - Inform employees if there are changes to shifts or attendance locations.
  3. Watch for conflicts - Ensure added employees do not have schedule conflicts in other work groups.
  4. Update gradually - If there are many changes, do them gradually to avoid errors.
  5. Documentation - Record changes made for audit purposes.
  6. Test - After changing attendance locations, perform a test to ensure it functions.
  7. Review regularly - Evaluate work groups periodically to ensure they still meet needs.

Troubleshooting

Changes not saved

  • Make sure to click Save after Step 3
  • Check internet connection
  • Try refreshing the page and editing again

Employee cannot be added

  • Ensure the employee is not already in another work group
  • Check employee status (must be active)
  • Search with the right keywords

Employee cannot be removed

  • Ensure the employee is actually in the work group
  • Refresh the right panel
  • Try removing one by one if selecting many

Attendance location does not appear

  • Search with different keywords
  • Ensure the location is configured in Work Location
  • Refresh the page

Shift cannot be changed

  • Ensure the new shift is configured
  • Check if the new shift is compatible with the calendar
  • Consult with administrator if necessary

Next Steps

Copyright © 2026